InstaVolt Ltd · EV charging site
McDonald's Bow
4 Payne Road, Bow, E3 2SP
McDonald's Bow is an EV charging site in Bow, Greater London, run by InstaVolt Ltd. Its 2 sockets reach up to 120 kW, with CCS at the top speed, and the price is listed as £0.75/kWh. 421 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Burdett Road Parking/Charging (Chargemaster), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at McDonald's Bow (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at McDonald's Bow (InstaVolt Ltd)?
Up to 120 kW DC via CCS, CHAdeMO.
How many charging sockets does McDonald's Bow (InstaVolt Ltd) have?
2 charging sockets: 2 × 120 kW CCS, 2 × 50 kW CHAdeMO.
Who operates McDonald's Bow?
McDonald's Bow is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to McDonald's Bow (InstaVolt Ltd)?
Burdett Road Parking/Charging (Chargemaster) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at McDonald's Bow (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at McDonald's Bow (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at McDonald's Bow (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 72 Bromley High Street
- ubitricity Distributed Energy Systems UK Ltd. Bromley High Street, Saint Leonards Priory Pa
- ubitricity Distributed Energy Systems UK Ltd. Edgar Road, Junc. Bromley High Street, Edgar
- ubitricity Distributed Energy Systems UK Ltd. 15 Baldock Street
- ubitricity Distributed Energy Systems UK Ltd. Bromley High Street, Junc. interchange approa
- ubitricity Distributed Energy Systems UK Ltd. Bromley High Street, Junc. Saint Leonards Str
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Bromley High Street, Saint Leonards Priory Pa · 55p per kWh · 5 kW · 0.1 mi