# McDonald's Catterick - Garrison · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-mcdonald-s-catterick-garrison-uk

McDonald's Catterick - Garrison is an EV charging site in Northallerton, North Yorkshire, run by InstaVolt Ltd. It has a single socket, with CCS at up to 85 kW, and the price is listed as £0.85/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Gough Road, DL9 3AE
- **Area:** Northallerton, North Yorkshire, United Kingdom
- **Coordinates (latitude, longitude):** 54.37569, -1.72265

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 85 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |

- **Price:** £0.85/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How much does it cost to charge at McDonald's Catterick - Garrison (InstaVolt Ltd)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at McDonald's Catterick - Garrison (InstaVolt Ltd)?

Up to 85 kW DC via CCS, CHAdeMO.

### How many charging sockets does McDonald's Catterick - Garrison (InstaVolt Ltd) have?

1 charging socket: 1 × 85 kW CCS, 1 × 50 kW CHAdeMO.

### Who operates McDonald's Catterick - Garrison?

McDonald's Catterick - Garrison is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at McDonald's Catterick - Garrison (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 41 min on the 85 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at McDonald's Catterick - Garrison (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 32 min on the 85 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at McDonald's Catterick - Garrison (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 46 min on the 85 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Northallerton](https://ampmap.co.uk/chargers/united-kingdom/north-yorkshire/northallerton)
- [Cheapest charging in Northallerton](https://ampmap.co.uk/chargers/united-kingdom/north-yorkshire/northallerton/cheapest)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [Pod Point Tesco Superstore - Catterick Garrison](https://ampmap.co.uk/charger/pod-point-tesco-superstore-catterick-garrison-uk) - CCS / CHAdeMO 50 kW, Type 2 22 kW · Richmondshire Walk · From 44.4p/kWh
- [Pod Point RazorBlue](https://ampmap.co.uk/charger/pod-point-razorblue-uk) - Type 2 7 kW · Razorblue House Battalion Court · From 24p/kWh
- [Jet Charge](https://ampmap.co.uk/charger/jet-charge-uk) - CCS 150 kW, CHAdeMO 100 kW · Catterick Road
- [Brompton Lakes · Project EV](https://ampmap.co.uk/charger/project-ev-brompton-lakes-uk) - Type 2 7 kW · Easby Mews
- [CB Farms · Project EV](https://ampmap.co.uk/charger/project-ev-cb-farms-uk) - Type 2 7 kW · Back Lane

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-mcdonald-s-catterick-garrison-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 8 Apr 2026).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
