# McDonald's Harringay · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-mcdonald-s-harringay-uk

McDonald's Harringay is an EV charging site in Harringay, Greater London, run by InstaVolt Ltd. Its 2 sockets reach up to 120 kW, with CCS at the top speed, and the price is listed as £0.75/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Green Lanes, N4 1DR
- **Area:** Harringay, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.57709, -0.09803

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 120 kW | 2 | Not listed |
| CHAdeMO | 50 kW | 2 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at McDonald's Harringay (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at McDonald's Harringay (InstaVolt Ltd)?

Up to 120 kW DC via CCS, CHAdeMO.

### How many charging sockets does McDonald's Harringay (InstaVolt Ltd) have?

2 charging sockets: 2 × 120 kW CCS, 2 × 50 kW CHAdeMO.

### Who operates McDonald's Harringay?

McDonald's Harringay is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at McDonald's Harringay (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at McDonald's Harringay (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at McDonald's Harringay (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Harringay](https://ampmap.co.uk/chargers/united-kingdom/greater-london/harringay)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [Rutland Gardens · Total Energies](https://ampmap.co.uk/charger/total-energies-rutland-gardens-uk) - Type 2 7 kW, J-1772 4 kW · 2 Rutland Gardens
- [35-37 Beechfield Road · Char.gy](https://ampmap.co.uk/charger/char-gy-35-37-beechfield-road-uk) - Type 2 5 kW · 35 - 37 Beechfield Road
- [60-62 Beechfield Road · Char.gy](https://ampmap.co.uk/charger/char-gy-60-62-beechfield-road-uk) - Type 2 5 kW · 60 - 62 Beechfield Road
- [Allison Road · Total Energies](https://ampmap.co.uk/charger/total-energies-allison-road-uk) - Type 2 7 kW · Allison Road
- [Oakfield Road · Char.gy](https://ampmap.co.uk/charger/char-gy-oakfield-road-uk) - Type 2 5 kW · Oakfield Road
- [84 Mount View Road · Char.gy](https://ampmap.co.uk/charger/char-gy-84-mount-view-road-uk) - Type 2 5 kW · 84 Mount View Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-mcdonald-s-harringay-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
