InstaVolt Ltd · EV charging site
McDonald's Stockport
Station Road, Stockport, SK1 3SS
McDonald's Stockport is an EV charging site in Stockport, Borough of Stockport, run by InstaVolt Ltd. Its 2 sockets reach up to 120 kW, with CCS at the top speed, and the price is listed as £0.75/kWh. 11 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Newbridge Lane Car Park (Be.EV), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at McDonald's Stockport (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at McDonald's Stockport (InstaVolt Ltd)?
Up to 120 kW DC via CCS, CHAdeMO.
How many charging sockets does McDonald's Stockport (InstaVolt Ltd) have?
2 charging sockets: 2 × 120 kW CCS, 2 × 100 kW CHAdeMO.
Who operates McDonald's Stockport?
McDonald's Stockport is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to McDonald's Stockport (InstaVolt Ltd)?
Newbridge Lane Car Park (Be.EV) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at McDonald's Stockport (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at McDonald's Stockport (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at McDonald's Stockport (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- NCP Stockport Exchange
- St Petersgate
- Churchgate Car Park
- Newbridge Lane Car Park
- West Way Stockport Nissan
- Decathlon Stockport
- Cheapest nearby
- St Petersgate · 59p per kWh · 7 kW · 0.2 mi
- Fastest nearby
- Decathlon Stockport · 150 kW · 0.5 mi