# Newmains Filling Station · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-newmains-filling-station-uk

Newmains Filling Station is an EV charging site in Wishaw, North Lanarkshire, run by InstaVolt Ltd. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £0.75/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 75 Main Street, ML2 9AT
- **Area:** Wishaw, North Lanarkshire, United Kingdom
- **Coordinates (latitude, longitude):** 55.78189, -3.87813

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Newmains Filling Station (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Newmains Filling Station (InstaVolt Ltd)?

Up to 50 kW DC via CHAdeMO, CCS.

### How many charging sockets does Newmains Filling Station (InstaVolt Ltd) have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.

### Who operates Newmains Filling Station?

Newmains Filling Station is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Newmains Filling Station (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Newmains Filling Station (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Newmains Filling Station (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Wishaw](https://ampmap.co.uk/chargers/united-kingdom/north-lanarkshire/wishaw)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [Pod Point Tesco Extra - Wishaw Belhaven](https://ampmap.co.uk/charger/pod-point-tesco-extra-wishaw-belhaven-uk) - Type 2 7 kW · Belhaven Road · From 44.4p/kWh
- [Wishaw Park & Ride (1) · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-wishaw-park-and-ride-1-uk) - Type 2 7 kW · 16 Dundyvan Street
- [Wishaw Park and Ride · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-wishaw-park-and-ride-uk) - Type 2 7 kW · Wishaw
- [Sika Wishaw 2 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-sika-wishaw-2-uk) - Type 2 43 kW · Netherton Street
- [Caledonian Retail Park, Wishaw · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-caledonian-retail-park-uk) - CCS 300 kW, CHAdeMO 50 kW · Glasgow Road · From 89p/kWh
- [Dalziel Park Hotel and Golf Club · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-dalziel-park-hotel-and-golf-club-uk) - Type 2 22 kW · 100 Hagen Drive

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-newmains-filling-station-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
