# Nowell Filling Station · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-nowell-filling-station-uk

Nowell Filling Station is an EV charging site in Leeds, City and Borough of Leeds, run by InstaVolt Ltd. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and the price is listed as £0.75/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Harehills Lane, LS9 6LQ
- **Area:** Leeds, City and Borough of Leeds, United Kingdom
- **Coordinates (latitude, longitude):** 53.80565, -1.50512

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Nowell Filling Station (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Nowell Filling Station (InstaVolt Ltd)?

Up to 50 kW DC via CCS, CHAdeMO.

### How many charging sockets does Nowell Filling Station (InstaVolt Ltd) have?

1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO.

### Who operates Nowell Filling Station?

Nowell Filling Station is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Nowell Filling Station (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nowell Filling Station (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Nowell Filling Station (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Leeds](https://ampmap.co.uk/chargers/united-kingdom/city-and-borough-of-leeds/leeds)
- [Cheapest charging in Leeds](https://ampmap.co.uk/chargers/united-kingdom/city-and-borough-of-leeds/leeds/cheapest)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [Asda Harehills Lane · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-asda-harehills-lane-uk) - CCS 50 kW, CHAdeMO 50 kW · Lupton Avenue
- [The Old Fire Station Community Centre · evcharge.online](https://ampmap.co.uk/charger/evcharge-online-the-old-fire-station-community-centre-uk) - Type 2 7 kW · Fire Station Houses
- [Pod Point Trinity Academy Leeds](https://ampmap.co.uk/charger/pod-point-trinity-academy-leeds-2-uk) - Type 2 22 kW, Type 2 7 kW · Torre Road · From 39.6p/kWh
- [Morrisons Leeds Harehills · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-leeds-harehills-uk) - CCS 50 kW, CHAdeMO 50 kW · Harehills Lane
- [Abaseen Superstore · Alfapower](https://ampmap.co.uk/charger/alfapower-abaseen-superstore-uk) - Type 2 22 kW · 171 Harehills Lane
- [Bristol Street · Alfapower](https://ampmap.co.uk/charger/alfapower-bristol-street-uk) - CCS 100 kW, CHAdeMO 60 kW · Sheepscar Junction

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-nowell-filling-station-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
