InstaVolt Ltd · EV charging site
Nuns' Bridges Filling Station
172 Bury Road, Thetford, IP24 3ED
Nuns' Bridges Filling Station is an EV charging site in Thetford, Norfolk, run by InstaVolt Ltd. Both of its sockets are 50 kW CCS and CHAdeMO, and the price is listed as £0.85/kWh. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Chase (Thetford) (evyve), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.85/kWh(from Open Charge Map, 21 Oct 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Nuns' Bridges Filling Station (InstaVolt Ltd)?
The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Nuns' Bridges Filling Station (InstaVolt Ltd)?
Up to 50 kW DC via CCS, CHAdeMO.
How many charging sockets does Nuns' Bridges Filling Station (InstaVolt Ltd) have?
2 charging sockets: 2 × 50 kW CCS, 2 × 50 kW CHAdeMO.
Who operates Nuns' Bridges Filling Station?
Nuns' Bridges Filling Station is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Nuns' Bridges Filling Station (InstaVolt Ltd)?
Chase (Thetford) (evyve) is 0.5 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Nuns' Bridges Filling Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nuns' Bridges Filling Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nuns' Bridges Filling Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- British Trust for Ornithology
- Chase (Thetford)
- Pike Lane Car Park
- IONITY GmbH IONITY Thetford
- Pod Point Thetford Healthy Living Centre
- Icknield Way SF Connect
- Cheapest nearby
- Pike Lane Car Park · 56p per kWh · 50 kW · 0.6 mi
- Fastest nearby
- Icknield Way SF Connect · 300 kW · 1.3 mi