# Nuns' Bridges Filling Station · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-nuns-bridges-filling-station-uk

Nuns' Bridges Filling Station is an EV charging site in Thetford, Norfolk, run by InstaVolt Ltd. Both of its sockets are 50 kW CCS and CHAdeMO, and the price is listed as £0.85/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 172 Bury Road, IP24 3ED
- **Area:** Thetford, Norfolk, United Kingdom
- **Coordinates (latitude, longitude):** 52.40487, 0.74521

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 2 | Not listed |
| CHAdeMO | 50 kW | 2 | Not listed |

- **Price:** £0.85/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Nuns' Bridges Filling Station (InstaVolt Ltd)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Nuns' Bridges Filling Station (InstaVolt Ltd)?

Up to 50 kW DC via CCS, CHAdeMO.

### How many charging sockets does Nuns' Bridges Filling Station (InstaVolt Ltd) have?

2 charging sockets: 2 × 50 kW CCS, 2 × 50 kW CHAdeMO.

### Who operates Nuns' Bridges Filling Station?

Nuns' Bridges Filling Station is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Nuns' Bridges Filling Station (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nuns' Bridges Filling Station (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Nuns' Bridges Filling Station (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Thetford](https://ampmap.co.uk/chargers/united-kingdom/norfolk/thetford)
- [Cheapest charging in Thetford](https://ampmap.co.uk/chargers/united-kingdom/norfolk/thetford/cheapest)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [British Trust for Ornithology](https://ampmap.co.uk/charger/british-trust-for-ornithology-uk) - Type 2 22 kW · The Barn
- [Chase (Thetford) · evyve](https://ampmap.co.uk/charger/evyve-chase-thetford-uk) - CCS 75 kW · Newtown · From 85p/kWh
- [Pike Lane Car Park · POGO](https://ampmap.co.uk/charger/pogo-pike-lane-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Pike Lane · From 56p/kWh
- [IONITY GmbH IONITY Thetford](https://ampmap.co.uk/charger/ionity-gmbh-ionity-thetford-uk) - CCS 200 kW · Forest Retail Park · From 83.3p/kWh
- [Pod Point Thetford Healthy Living Centre](https://ampmap.co.uk/charger/pod-point-thetford-healthy-living-centre-uk) - Type 2 7 kW · Croxton Rd · From 60p/kWh
- [Icknield Way SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-icknield-way-sf-connect-uk) - CCS 300 kW, CHAdeMO 100 kW · Norwich Rd, A1075

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-nuns-bridges-filling-station-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 21 Oct 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
