# Oak Park · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-oak-park-uk

Oak Park is an EV charging site in Brierley Hill, Dudley, run by InstaVolt Ltd. All 8 of its sockets are 120 kW CCS.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Oak Park, DY5 1HR
- **Area:** Brierley Hill, Dudley, United Kingdom
- **Coordinates (latitude, longitude):** 52.48929, -2.11921

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 120 kW | 8 | Not listed |

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How fast is charging at Oak Park (InstaVolt Ltd)?

Up to 120 kW DC via CCS.

### How many charging sockets does Oak Park (InstaVolt Ltd) have?

8 charging sockets: 8 × 120 kW CCS.

### Who operates Oak Park?

Oak Park is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Oak Park (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Oak Park (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Oak Park (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Brierley Hill](https://ampmap.co.uk/chargers/united-kingdom/dudley/brierley-hill)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [Port West Waterfront West · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-dudley-road-uk) - CCS 300 kW, CHAdeMO 100 kW · Retail Park, Brierley Hill
- [MFG Merry Hill · MFG EV Power](https://ampmap.co.uk/charger/mfg-ev-power-mfg-merry-hill-uk) - CCS 150 kW, CHAdeMO 50 kW · The Waterfront
- [Brierly Hill Dudley · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-brierly-hill-dudley-uk) - CHAdeMO 50 kW, Type 2 50 kW · Brierly Hill Dudley
- [Level Street, Brierly Hill - Public Car Park · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-level-street-brierly-hill-public-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Brierly Hill
- [Merry Hill, UK · Tesla](https://ampmap.co.uk/charger/tesla-merry-hill-supercharger-uk) - CCS 250 kW · Pedmore Road · From 25p/kWh
- [zest-gold-type-plan · Zest Charging](https://ampmap.co.uk/charger/zest-charging-zest-gold-type-plan-uk) - Type 2 75 kW · The Embankment

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-oak-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 15 Apr 2024).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
