InstaVolt Ltd · EV charging site
Oakwood Hill East Industrial Estate
Oakwood Hill East Industrial Estate, Woodford Green, IG10 3TZ
Oakwood Hill East Industrial Estate is an EV charging site in Woodford Green, Greater London, run by InstaVolt Ltd. Its 2 sockets reach up to 120 kW, with CCS at the top speed, and the price is listed as £0.85/kWh. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Chigwell SF Connect (BP Pulse), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.85/kWh(from Open Charge Map, 30 Mar 2024)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Oakwood Hill East Industrial Estate (InstaVolt Ltd)?
The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Oakwood Hill East Industrial Estate (InstaVolt Ltd)?
Up to 120 kW DC via CCS, CHAdeMO.
How many charging sockets does Oakwood Hill East Industrial Estate (InstaVolt Ltd) have?
2 charging sockets: 2 × 120 kW CCS, 2 × 50 kW CHAdeMO.
Who operates Oakwood Hill East Industrial Estate?
Oakwood Hill East Industrial Estate is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Oakwood Hill East Industrial Estate (InstaVolt Ltd)?
Chigwell SF Connect (BP Pulse) is 0.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Oakwood Hill East Industrial Estate (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Oakwood Hill East Industrial Estate (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Oakwood Hill East Industrial Estate (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Chigwell SF Connect
- InstaVolt Burton Road Car Park
- InstaVolt Loughton Leisure Centre
- Loughton Station
- Morrisons Loughton
- Old Loughtonians
- Fastest nearby
- InstaVolt Burton Road Car Park · 160 kW · 0.6 mi