# Oakwood Hill East Industrial Estate · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-oakwood-hill-east-industrial-estate-uk

Oakwood Hill East Industrial Estate is an EV charging site in Woodford Green, Greater London, run by InstaVolt Ltd. Its 2 sockets reach up to 120 kW, with CCS at the top speed, and the price is listed as £0.85/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Oakwood Hill East Industrial Estate, IG10 3TZ
- **Area:** Woodford Green, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.64240, 0.07595

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 120 kW | 2 | Not listed |
| CHAdeMO | 50 kW | 2 | Not listed |

- **Price:** £0.85/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Oakwood Hill East Industrial Estate (InstaVolt Ltd)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Oakwood Hill East Industrial Estate (InstaVolt Ltd)?

Up to 120 kW DC via CCS, CHAdeMO.

### How many charging sockets does Oakwood Hill East Industrial Estate (InstaVolt Ltd) have?

2 charging sockets: 2 × 120 kW CCS, 2 × 50 kW CHAdeMO.

### Who operates Oakwood Hill East Industrial Estate?

Oakwood Hill East Industrial Estate is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Oakwood Hill East Industrial Estate (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Oakwood Hill East Industrial Estate (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Oakwood Hill East Industrial Estate (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Woodford Green](https://ampmap.co.uk/chargers/united-kingdom/greater-london/woodford-green)
- [Cheapest charging in Woodford Green](https://ampmap.co.uk/chargers/united-kingdom/greater-london/woodford-green/cheapest)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [Chigwell SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-chigwell-sf-connect-uk) - CCS 150 kW · The Broadway, Debden
- [InstaVolt Burton Road Car Park · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-instavolt-burton-road-car-park-uk) - CCS 160 kW, CHAdeMO 60 kW · Burton Road
- [InstaVolt Loughton Leisure Centre · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-instavolt-loughton-leisure-centre-uk) - CCS 160 kW, CHAdeMO 60 kW · Traps Hill
- [Loughton Station · Total Energies](https://ampmap.co.uk/charger/total-energies-loughton-station-uk) - Type 2 22 kW · Old Station Road
- [Morrisons Loughton · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-loughton-uk) - CCS 50 kW, CHAdeMO 50 kW · 248-250 High Road
- [Old Loughtonians](https://ampmap.co.uk/charger/old-loughtonians-uk) - Type 2 22 kW · Old Loughtonians Hockey Club

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-oakwood-hill-east-industrial-estate-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 30 Mar 2024).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
