# Purlieu Construction Company · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-purlieu-construction-company-uk

Purlieu Construction Company is an EV charging site in Hythe, Hampshire, run by InstaVolt Ltd. Its 4 sockets reach up to 120 kW, with CCS at the top speed, and the price is listed as £0.75/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Hardley Industrial Estate, SO45 3NR
- **Area:** Hythe, Hampshire, United Kingdom
- **Coordinates (latitude, longitude):** 50.84267, -1.39599

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 120 kW | 4 | Not listed |
| CHAdeMO | 50 kW | 4 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Purlieu Construction Company (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Purlieu Construction Company (InstaVolt Ltd)?

Up to 120 kW DC via CCS, CHAdeMO.

### How many charging sockets does Purlieu Construction Company (InstaVolt Ltd) have?

4 charging sockets: 4 × 120 kW CCS, 4 × 50 kW CHAdeMO.

### Who operates Purlieu Construction Company?

Purlieu Construction Company is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Purlieu Construction Company (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Purlieu Construction Company (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Purlieu Construction Company (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Hythe](https://ampmap.co.uk/chargers/united-kingdom/hampshire/hythe)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [Brook Row Ladycross Road · Be.EV](https://ampmap.co.uk/charger/joju-ltd-ladycross-road-uk) - Type 2 22 kW · Brook Row, Ladycross Road · From 64p/kWh
- [Jones Lane Car Park · Joju Ltd](https://ampmap.co.uk/charger/joju-ltd-jones-lane-car-park-uk) - Type 2 22 kW · Jones Lane Car Park
- [New Forest New Road Car Park · Be.EV](https://ampmap.co.uk/charger/joju-ltd-new-road-car-park-uk) - CCS 60 kW · Pylewell Road · From 84p/kWh
- [Jones Lane Car Park · Be.EV](https://ampmap.co.uk/charger/joju-ltd-jones-lane-car-park-2-uk) - CCS 60 kW · Brinton Lane · From 84p/kWh
- [Pod Point Tesco Superstore - Hythe](https://ampmap.co.uk/charger/pod-point-tesco-superstore-hythe-uk) - Type 2 7 kW · Sizer Way Dibden · From 44.4p/kWh
- [Pod Point Exbury Gardens](https://ampmap.co.uk/charger/pod-point-exbury-gardens-uk) - Type 2 7 kW · Summer Lane · From 42p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-purlieu-construction-company-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 5 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
