InstaVolt Ltd · EV charging site
Southville Services A370
Coronation Road, Bristol, BS3 1RN
Southville Services A370 is an EV charging site in Bristol, City of Bristol, run by InstaVolt Ltd. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and the price is listed as £0.75/kWh. 16 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is College Street Car Park (GeniePoint), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Southville Services A370 (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Southville Services A370 (InstaVolt Ltd)?
Up to 50 kW DC via CCS, CHAdeMO.
How many charging sockets does Southville Services A370 (InstaVolt Ltd) have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO.
Who operates Southville Services A370?
Southville Services A370 is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Southville Services A370 (InstaVolt Ltd)?
College Street Car Park (GeniePoint) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Southville Services A370 (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Southville Services A370 (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Southville Services A370 (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Tobacco Factory
- Bristol City Council Building Car Park
- City of Bristol College - College Green Centre
- College Street Car Park
- Pod Point South Bristol Retail Park
- Millennium Square underground car park
- Cheapest nearby
- Pod Point South Bristol Retail Park · 50.4p per kWh · 7 kW · 0.6 mi