# Stanier Close · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-stanier-close-uk

Stanier Close is an EV charging site in Kettering, North Northamptonshire, run by InstaVolt Ltd. Its 12 sockets reach up to 160 kW, with CCS at the top speed, and the price is listed as £0.85/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Stanier Close, NN16 9XW
- **Area:** Kettering, North Northamptonshire, United Kingdom
- **Coordinates (latitude, longitude):** 52.40580, -0.73618

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 160 kW | 7 | Not listed |
| CCS | 80 kW | 5 | Not listed |
| CHAdeMO | 62 kW | 2 | Not listed |

- **Price:** £0.85/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** Opened 2025-03-14

## Common questions

### How much does it cost to charge at Stanier Close (InstaVolt Ltd)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Stanier Close (InstaVolt Ltd)?

Up to 160 kW DC via CCS, CHAdeMO.

### How many charging sockets does Stanier Close (InstaVolt Ltd) have?

12 charging sockets: 1 × 80 kW CCS, 1 × 80 kW CCS, 1 × 160 kW CCS, 1 × 160 kW CCS, 1 × 160 kW CCS, 1 × 160 kW CCS, 1 × 160 kW CCS, 1 × 80 kW CCS, 1 × 80 kW CCS, 1 × 80 kW CCS, 1 × 160 kW CCS, 1 × 62 kW CHAdeMO, 1 × 160 kW CCS, 1 × 62 kW CHAdeMO.

### Who operates Stanier Close?

Stanier Close is on the InstaVolt Ltd network. For site issues, the operator lists 0808 281 44 44.

### How long does a Tesla Model Y Long Range take to charge at Stanier Close (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 26 min on the 160 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stanier Close (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 23 min on the 160 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Stanier Close (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 39 min on the 160 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Kettering](https://ampmap.co.uk/chargers/united-kingdom/north-northamptonshire/kettering)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [Richard Sanders](https://ampmap.co.uk/charger/richard-sanders-uk) - Type 2 7 kW · Brunel Close
- [Northfield Retail Park · Allego BV](https://ampmap.co.uk/charger/allego-bv-northfield-retail-park-uk) - CCS 200 kW · Northfield Avenue
- [Bee Cool ACS · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-bee-cool-acs-uk) - CCS / CHAdeMO / Type 2 50 kW · 19-9 Cunliffe Dr · From 89p/kWh
- [Telford Way · Believ](https://ampmap.co.uk/charger/believ-telford-way-uk) - Type 2 22 kW · Telford Way
- [Linnell Way · Believ](https://ampmap.co.uk/charger/believ-linnell-way-uk) - Type 2 22 kW · Linnnell Way
- [Morrisons Kettering · MFG EV Power](https://ampmap.co.uk/charger/mfg-ev-power-morrisons-kettering-uk) - CCS 50 kW · Lower Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-stanier-close-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 15 Jul 2025).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
