# Starbucks Beighton Chesterfield Road · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-starbucks-beighton-chesterfield-road-uk

Starbucks Beighton Chesterfield Road is an EV charging site in Rotherham, run by InstaVolt Ltd. All 4 of its sockets are 50 kW CHAdeMO and CCS, and the price is listed as £0.75/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Chesterfield Road, S20 1DJ
- **Area:** Rotherham, United Kingdom
- **Coordinates (latitude, longitude):** 53.35543, -1.32909

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 4 | Not listed |
| CHAdeMO | 50 kW | 4 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Starbucks Beighton Chesterfield Road (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Starbucks Beighton Chesterfield Road (InstaVolt Ltd)?

Up to 50 kW DC via CHAdeMO, CCS.

### How many charging sockets does Starbucks Beighton Chesterfield Road (InstaVolt Ltd) have?

4 charging sockets: 4 × 50 kW CHAdeMO, 4 × 50 kW CCS.

### Who operates Starbucks Beighton Chesterfield Road?

Starbucks Beighton Chesterfield Road is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Starbucks Beighton Chesterfield Road (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Starbucks Beighton Chesterfield Road (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Starbucks Beighton Chesterfield Road (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Rotherham](https://ampmap.co.uk/chargers/united-kingdom/rotherham/rotherham)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [Elmwood Farm (Beighton) · evyve](https://ampmap.co.uk/charger/evyve-elmwood-farm-beighton-uk) - CCS 75 kW · Old Colliery Way · From 85p/kWh
- [Water Sports · Joju Ltd](https://ampmap.co.uk/charger/joju-ltd-water-sports-uk) - Type 2 7 kW · Water Sports
- [Crystal Peaks Shopping Centre · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-crystal-peaks-shopping-centre-uk) - Type 2 7 kW, BS1363 3 Pin 13 Amp 3 kW · Centre Management Suite
- [Best Western Plus Aston Hall Hotel · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-best-western-plus-aston-hall-hotel-uk) - Type 2 7 kW, BS1363 3 Pin 13 Amp 3 kW · Worksop Road
- [Halfway Park & Ride 1 · Blink Charging](https://ampmap.co.uk/charger/blink-charging-halfway-park-and-ride-1-uk) - Type 2 22 kW · Eckington Way
- [Mosborough Hall Hotel · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-mosborough-hall-hotel-uk) - Type 2 7 kW, BS1363 3 Pin 13 Amp 3 kW · High Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-starbucks-beighton-chesterfield-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
