# Starbucks Gain Lane · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-starbucks-gain-lane-uk

Starbucks Gain Lane is an EV charging site in Pudsey, City and Borough of Leeds, run by InstaVolt Ltd. Both of its sockets are 50 kW CHAdeMO and CCS, and the price is listed as £0.75/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Gain Lane, BD3 7DW
- **Area:** Pudsey, City and Borough of Leeds, United Kingdom
- **Coordinates (latitude, longitude):** 53.80253, -1.70242

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 2 | Not listed |
| CHAdeMO | 50 kW | 2 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** Open 24/7 - Chargers accessible 24/7. Starbucks open 06:00-21:00.

## Common questions

### How much does it cost to charge at Starbucks Gain Lane (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Starbucks Gain Lane (InstaVolt Ltd)?

Up to 50 kW DC via CHAdeMO, CCS.

### How many charging sockets does Starbucks Gain Lane (InstaVolt Ltd) have?

2 charging sockets: 2 × 50 kW CHAdeMO, 2 × 50 kW CCS.

### Who operates Starbucks Gain Lane?

Starbucks Gain Lane is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Starbucks Gain Lane (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Starbucks Gain Lane (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Starbucks Gain Lane (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Pudsey](https://ampmap.co.uk/chargers/united-kingdom/city-and-borough-of-leeds/pudsey)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [McDonald's Thornbury · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-mcdonald-s-thornbury-uk) - CCS 120 kW, CHAdeMO 100 kW · 1003 Leeds Road
- [Morrisons Bradford Thornbury · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-bradford-thornbury-uk) - CCS 50 kW, CHAdeMO 50 kW · Rushton Avenue
- [Pod Point Aldi - Bradford](https://ampmap.co.uk/charger/pod-point-aldi-bradford-2-uk) - Type 2 7 kW · Leeds Old Road Thornbury · From 25.2p/kWh
- [Morrisons Hillhouse · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-hillhouse-uk) - CCS 50 kW, CHAdeMO 50 kW · Gain Lane
- [Orange Street Car Park · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-orange-street-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Orange Street
- [Killinghall Car Park 1 · Blink Charging](https://ampmap.co.uk/charger/blink-charging-killinghall-car-park-1-uk) - Type 2 22 kW · Eccleshill

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-starbucks-gain-lane-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
