# Starbucks, Topcliffe, A168 · InstaVolt Ltd

Web page: https://ampmap.co.uk/charger/instavolt-ltd-starbucks-topcliffe-a168-uk

Starbucks, Topcliffe, A168 is an EV charging site in Ripon, North Yorkshire, run by InstaVolt Ltd. All 4 of its sockets are 50 kW CCS and CHAdeMO, and the price is listed as £0.75/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Malthurst Thirsk Petrol Station, YO7 3HN
- **Area:** Ripon, North Yorkshire, United Kingdom
- **Coordinates (latitude, longitude):** 54.19518, -1.36334

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 4 | Not listed |
| CHAdeMO | 50 kW | 4 | Not listed |

- **Price:** £0.75/kWh (from Open Charge Map)

## Site information

- **Operator:** InstaVolt Ltd
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** 4 x chargers behind Starbucks

## Common questions

### How much does it cost to charge at Starbucks, Topcliffe, A168 (InstaVolt Ltd)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Starbucks, Topcliffe, A168 (InstaVolt Ltd)?

Up to 50 kW DC via CCS, CHAdeMO.

### How many charging sockets does Starbucks, Topcliffe, A168 (InstaVolt Ltd) have?

4 charging sockets: 4 × 50 kW CCS, 4 × 50 kW CHAdeMO.

### Who operates Starbucks, Topcliffe, A168?

Starbucks, Topcliffe, A168 is on the InstaVolt Ltd network.

### How long does a Tesla Model Y Long Range take to charge at Starbucks, Topcliffe, A168 (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Starbucks, Topcliffe, A168 (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Starbucks, Topcliffe, A168 (InstaVolt Ltd)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Ripon](https://ampmap.co.uk/chargers/united-kingdom/north-yorkshire/ripon)
- [InstaVolt Ltd chargers](https://ampmap.co.uk/networks/instavolt-ltd)

## Chargers near this site

- [Pod Point Ruby Lodge Care Home](https://ampmap.co.uk/charger/pod-point-ruby-lodge-care-home-2-uk) - Type 2 22 kW · Inspiration Way · From 75.6p/kWh
- [Pod Point Tesco Superstore - Thirsk](https://ampmap.co.uk/charger/pod-point-tesco-superstore-thirsk-uk) - Type 2 7 kW · Station Road · From 44.4p/kWh
- [The Oak Lakes Caravan Park · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-the-oak-lakes-caravan-park-uk) - Type 2 7 kW · Sessay,
- [MFG Thirsk · MFG EV Power](https://ampmap.co.uk/charger/mfg-ev-power-mfg-thirsk-uk) - CCS 150 kW, CHAdeMO 100 kW · York Road A170
- [Millgate Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-millgate-car-park-uk) - CCS / CHAdeMO 50 kW · Millgate Car Park, Marage Road · From 89p/kWh
- [North Yorkshire Council](https://ampmap.co.uk/charger/north-yorkshire-council-uk) - Type 2 7 kW · Hambleton Crematorium

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/instavolt-ltd-starbucks-topcliffe-a168-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
