InstaVolt Ltd · EV charging site
The Bannatyne Spa
Kingsford Park, Colchester, CO2 0HS
The Bannatyne Spa is an EV charging site in Colchester, Essex, run by InstaVolt Ltd. Both of its sockets are 50 kW CCS and CHAdeMO, and the price is listed as £0.85/kWh. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Colchester, Stanway (Source EV), 2.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.85/kWh(from Open Charge Map, 1 Nov 2023)
- Getting there
- Open 24/7 Car park lights go off at 00:00.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Bannatyne Spa (InstaVolt Ltd)?
The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at The Bannatyne Spa (InstaVolt Ltd)?
Up to 50 kW DC via CCS, CHAdeMO.
How many charging sockets does The Bannatyne Spa (InstaVolt Ltd) have?
2 charging sockets: 2 × 50 kW CCS, 2 × 50 kW CHAdeMO.
Who operates The Bannatyne Spa?
The Bannatyne Spa is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to The Bannatyne Spa (InstaVolt Ltd)?
Colchester, Stanway (Source EV) is 2.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Bannatyne Spa (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Bannatyne Spa (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Bannatyne Spa (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- BMM-CP00498
- VendElectric Creffield Road Site
- Wellsley Road
- Pod Point Tollgate Retail Park (Tollgate Centre Colchester Limited)
- Colchester, Stanway
- COOP Mersea Road
- Cheapest nearby
- Pod Point Tollgate Retail Park (Tollgate Centre Colchester Limited) · 49.2p per kWh · 7 kW · 2.2 mi
- Fastest nearby
- Colchester, Stanway · 150 kW · 2.2 mi