Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

IONITY · EV charging site

IONITY GmbH IONITY Birmingham (Aston)

1 Rocky Ln, Aston, B6 5RQ

IONITY GmbH IONITY Birmingham (Aston) is an EV charging site in Aston, City and Borough of Birmingham, run by IONITY and open 24 hours a day. All 6 of its sockets are 400 kW CCS, and the published price is £0.83 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 508 charging sessions here over the last 30 days. 34 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is IONITY GmbH IONITY Birmingham (Aston South), 0.4 miles away.

Status

5 of 6 available

Checking status…

VerifiedLive status and details from Ionity’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 400 kW6 connectors · 83.3p per kWh5 free1 in use
71100% reliabilityAvailable
72100% reliabilityAvailable
73100% reliabilityCharging
74100% reliabilityAvailable
7599% reliabilityAvailable
76100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
IONITY
Opening hours
Open 24 hours
Payment
Contactless card at the chargerIn the IONITY appRFID card
Charger ID
71
Energy
100% renewable energy

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS400 kW83.3p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 400 kW CCS~21 min · ≈ 55 kWh · ~£46
Tesla Model 3 Rear-Wheel Drive 10–80% · 400 kW CCS~23 min · ≈ 40 kWh · ~£33
Audi Q4 e-tron 50 10–80% · 400 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 400 kW CCS~18 min · ≈ 51 kWh · ~£42
MG Motor MG4 Trophy 10–80% · 400 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 400 kW CCS~39 min · ≈ 41 kWh · ~£34

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at IONITY GmbH IONITY Birmingham (Aston)?

The listed price is £0.83/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at IONITY GmbH IONITY Birmingham (Aston)?

Up to 400 kW DC via CCS.

How many charging sockets does IONITY GmbH IONITY Birmingham (Aston) have?

6 charging sockets: 6 × 400 kW CCS. Live per-socket availability is shown on this page.

Is IONITY GmbH IONITY Birmingham (Aston) open 24/7?

Yes - IONITY GmbH IONITY Birmingham (Aston) is open 24 hours a day, 7 days a week.

When is IONITY GmbH IONITY Birmingham (Aston) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is IONITY GmbH IONITY Birmingham (Aston)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 508 observed charging sessions.

Who operates IONITY GmbH IONITY Birmingham (Aston)?

IONITY GmbH IONITY Birmingham (Aston) is on the IONITY network.

Where is the nearest other charger with 50 kW or more to IONITY GmbH IONITY Birmingham (Aston)?

IONITY GmbH IONITY Birmingham (Aston South) is 0.4 miles away in a straight line, with up to 200 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at IONITY GmbH IONITY Birmingham (Aston)?

A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at IONITY GmbH IONITY Birmingham (Aston)?

A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at IONITY GmbH IONITY Birmingham (Aston)?

A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Ionity · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.