IONITY · EV charging site
IONITY GmbH IONITY Dundee
New Craigie Road, Dundee, DD4 7FF
IONITY GmbH IONITY Dundee is an EV charging site in Dundee, Dundee City, run by IONITY and open 24 hours a day. All 6 of its sockets are 350 kW CCS, and the published price is £0.83 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 97% uptime and recorded 1028 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons (GeniePoint), 0.8 miles away.
Status
4 of 6 available
Checking status…
Connectors
CCS · 350 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- IONITY
- Opening hours
- Open 24 hours
- Payment
- In the IONITY appRFID card
- Charger ID
- 01
- Energy
- 100% renewable energy
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 350 kW | 83.3p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at IONITY GmbH IONITY Dundee?
The listed price is £0.83/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at IONITY GmbH IONITY Dundee?
Up to 350 kW DC via CCS.
How many charging sockets does IONITY GmbH IONITY Dundee have?
6 charging sockets: 6 × 350 kW CCS. Live per-socket availability is shown on this page.
Is IONITY GmbH IONITY Dundee open 24/7?
Yes - IONITY GmbH IONITY Dundee is open 24 hours a day, 7 days a week.
When is IONITY GmbH IONITY Dundee busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is IONITY GmbH IONITY Dundee?
Amp Map measured 97% uptime here from recorded live status over the last 30 days, across 1028 observed charging sessions.
Who operates IONITY GmbH IONITY Dundee?
IONITY GmbH IONITY Dundee is on the IONITY network.
Where is the nearest other charger with 50 kW or more to IONITY GmbH IONITY Dundee?
Morrisons (GeniePoint) is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at IONITY GmbH IONITY Dundee?
A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at IONITY GmbH IONITY Dundee?
A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at IONITY GmbH IONITY Dundee?
A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.