Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

IONITY · EV charging site

IONITY GmbH IONITY Edinburgh VH

Crewe Road South 140, Edinburgh, EH4 2NY

IONITY GmbH IONITY Edinburgh VH is an EV charging site in Edinburgh, City of Edinburgh, run by IONITY and open 24 hours a day. Its 12 sockets reach up to 400 kW, with CCS at the top speed, and published prices run from £0.62 to £0.83 per kWh. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 100% uptime and recorded 612 charging sessions here over the last 30 days. 9 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge Shell Little Waitrose Circle, 80 yards away.

Status

12 of 12 available

Checking status…

VerifiedLive status and details from Ionity’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 400 kW2 connectors · 83.3p per kWh2 free
71100% reliabilityAvailable
72100% reliabilityAvailable
CCS · 350 kW8 connectors · 83.3p per kWh8 free
01100% reliabilityAvailable
02100% reliabilityAvailable
03100% reliabilityAvailable
04100% reliabilityAvailable
05100% reliabilityAvailable
06100% reliabilityAvailable
07100% reliabilityAvailable
08100% reliabilityAvailable
CCS · 50 kW2 connectors · 62.3p per kWh2 free
51100% reliabilityAvailable
52100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
IONITY
Opening hours
Open 24 hours
Payment
Contactless card at the chargerIn the IONITY appRFID card
Charger ID
01
Energy
100% renewable energy

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS400 kW83.3p per kWh
CCS350 kW83.3p per kWh
CCS50 kW62.3p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 400 kW CCS~21 min · ≈ 55 kWh · ~£46
Tesla Model 3 Rear-Wheel Drive 10–80% · 400 kW CCS~23 min · ≈ 40 kWh · ~£33
Audi Q4 e-tron 50 10–80% · 400 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 400 kW CCS~18 min · ≈ 51 kWh · ~£42
MG Motor MG4 Trophy 10–80% · 400 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 400 kW CCS~39 min · ≈ 41 kWh · ~£34

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at IONITY GmbH IONITY Edinburgh VH?

The listed price is CCS £0.83/kWh · CCS £0.62/kWh · CCS £0.83/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at IONITY GmbH IONITY Edinburgh VH?

Up to 400 kW DC via CCS.

How many charging sockets does IONITY GmbH IONITY Edinburgh VH have?

12 charging sockets: 8 × 350 kW CCS, 2 × 50 kW CCS, 2 × 400 kW CCS. Live per-socket availability is shown on this page.

Is IONITY GmbH IONITY Edinburgh VH open 24/7?

Yes - IONITY GmbH IONITY Edinburgh VH is open 24 hours a day, 7 days a week.

When is IONITY GmbH IONITY Edinburgh VH busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is IONITY GmbH IONITY Edinburgh VH?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 612 observed charging sessions.

Who operates IONITY GmbH IONITY Edinburgh VH?

IONITY GmbH IONITY Edinburgh VH is on the IONITY network.

Where is the nearest other charger with 50 kW or more to IONITY GmbH IONITY Edinburgh VH?

Shell Recharge Shell Little Waitrose Circle is 80 yards away in a straight line, with up to 400 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at IONITY GmbH IONITY Edinburgh VH?

A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at IONITY GmbH IONITY Edinburgh VH?

A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at IONITY GmbH IONITY Edinburgh VH?

A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Ionity · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.