IONITY · EV charging site
IONITY GmbH IONITY Maidstone VH
Forstal Road, Abbey Gate, Boxley, Maidstone, ME14 3AQ
IONITY GmbH IONITY Maidstone VH is an EV charging site in Maidstone, Kent, run by IONITY and open 24 hours a day. Its 12 sockets reach up to 400 kW, with CCS at the top speed, and published prices run from £0.62 to £0.83 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 99% uptime and recorded 3228 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Mid Kent Shopping Centre (POGO), 0.9 miles away.
Status
12 of 12 available
Checking status…
Connectors
CCS · 400 kW
CCS · 350 kW
CCS · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- IONITY
- Opening hours
- Open 24 hours
- Payment
- In the IONITY appRFID card
- Charger ID
- 01
- Energy
- 100% renewable energy
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 400 kW | 83.3p per kWh |
| CCS | 350 kW | 83.3p per kWh |
| CCS | 50 kW | 62.3p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at IONITY GmbH IONITY Maidstone VH?
The listed price is CCS £0.83/kWh · CCS £0.83/kWh · CCS £0.62/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at IONITY GmbH IONITY Maidstone VH?
Up to 400 kW DC via CCS.
How many charging sockets does IONITY GmbH IONITY Maidstone VH have?
12 charging sockets: 8 × 350 kW CCS, 2 × 400 kW CCS, 2 × 50 kW CCS. Live per-socket availability is shown on this page.
Is IONITY GmbH IONITY Maidstone VH open 24/7?
Yes - IONITY GmbH IONITY Maidstone VH is open 24 hours a day, 7 days a week.
When is IONITY GmbH IONITY Maidstone VH busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is IONITY GmbH IONITY Maidstone VH?
Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 3228 observed charging sessions.
Who operates IONITY GmbH IONITY Maidstone VH?
IONITY GmbH IONITY Maidstone VH is on the IONITY network.
Where is the nearest other charger with 50 kW or more to IONITY GmbH IONITY Maidstone VH?
Mid Kent Shopping Centre (POGO) is 0.9 miles away in a straight line, with up to 200 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at IONITY GmbH IONITY Maidstone VH?
A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at IONITY GmbH IONITY Maidstone VH?
A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at IONITY GmbH IONITY Maidstone VH?
A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point DHL Exel Supply Chain Ltd
- Aylesford Highway Depot
- Mid Kent Shopping Centre
- Fields at Aylesford, Maidstone
- Bailey Bridge East 1
- Sessions House
- Cheapest nearby
- Pod Point DHL Exel Supply Chain Ltd · Free · 22 kW · 0.6 mi