IONITY · EV charging site
IONITY GmbH IONITY Stranraer
Lesley Retail Park, Bellevilla Road, Stranraer, DG9 8ED
IONITY GmbH IONITY Stranraer is an EV charging site in Stranraer, Dumfries and Galloway, run by IONITY and open 24 hours a day. All 6 of its sockets are 350 kW CCS, and the published price is £0.83 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 669 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is EH - Stranraer (GRIDSERVE), 60 yards away.
Status
5 of 6 available
Checking status…
Connectors
CCS · 350 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- IONITY
- Opening hours
- Open 24 hours
- Payment
- In the IONITY appRFID card
- Charger ID
- 01
- Energy
- 100% renewable energy
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 350 kW | 83.3p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at IONITY GmbH IONITY Stranraer?
The listed price is £0.83/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at IONITY GmbH IONITY Stranraer?
Up to 350 kW DC via CCS.
How many charging sockets does IONITY GmbH IONITY Stranraer have?
6 charging sockets: 6 × 350 kW CCS. Live per-socket availability is shown on this page.
Is IONITY GmbH IONITY Stranraer open 24/7?
Yes - IONITY GmbH IONITY Stranraer is open 24 hours a day, 7 days a week.
When is IONITY GmbH IONITY Stranraer busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is IONITY GmbH IONITY Stranraer?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 669 observed charging sessions.
Who operates IONITY GmbH IONITY Stranraer?
IONITY GmbH IONITY Stranraer is on the IONITY network.
Where is the nearest other charger with 50 kW or more to IONITY GmbH IONITY Stranraer?
EH - Stranraer (GRIDSERVE) is 60 yards away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at IONITY GmbH IONITY Stranraer?
A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at IONITY GmbH IONITY Stranraer?
A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at IONITY GmbH IONITY Stranraer?
A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- EH - Stranraer
- Pod Point Tesco Superstore - Stranraer
- Garo Dual 7KW
- Breastworks Car Park
- Galloway Community Hospital
- Cheapest nearby
- Pod Point Tesco Superstore - Stranraer · 44.4p per kWh · 7 kW · 110 yd