# IONITY GmbH IONITY Gretna Green

Web page: https://ampmap.co.uk/charger/ionity-gretna-green-uk

IONITY GmbH IONITY Gretna Green is an EV charging site in Carlisle, Cumbria, run by IONITY and open 24 hours a day. All 4 of its sockets are 350 kW CCS, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 100% uptime and recorded 1571 charging sessions here over the last 30 days.

## Status

2 of 4 open at 22 Nov 2026, 17:33 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** A74(M), Northbound, DG16 5HG
- **Area:** Carlisle, Cumbria, United Kingdom
- **Coordinates (latitude, longitude):** 55.00835, -3.08653

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 350 kW | 4 | £0.89/kWh | 2 free, 2 in use |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** IONITY
- **Opening hours:** Open 24 hours
- **Payment:** In the IONITY app; RFID card

## Common questions

### How much does it cost to charge at IONITY GmbH IONITY Gretna Green?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at IONITY GmbH IONITY Gretna Green?

Up to 350 kW DC via CCS.

### How many charging sockets does IONITY GmbH IONITY Gretna Green have?

4 charging sockets: 4 × 350 kW CCS. Live per-socket availability is shown on this page.

### Is IONITY GmbH IONITY Gretna Green open 24/7?

Yes - IONITY GmbH IONITY Gretna Green is open 24 hours a day, 7 days a week.

### When is IONITY GmbH IONITY Gretna Green busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

### How reliable is IONITY GmbH IONITY Gretna Green?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1571 observed charging sessions.

### Who operates IONITY GmbH IONITY Gretna Green?

IONITY GmbH IONITY Gretna Green is on the IONITY network.

### How long does a Tesla Model Y Long Range take to charge at IONITY GmbH IONITY Gretna Green?

A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at IONITY GmbH IONITY Gretna Green?

A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at IONITY GmbH IONITY Gretna Green?

A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Carlisle](https://ampmap.co.uk/chargers/united-kingdom/cumbria/carlisle)
- [Cheapest charging in Carlisle](https://ampmap.co.uk/chargers/united-kingdom/cumbria/carlisle/cheapest)
- [IONITY chargers](https://ampmap.co.uk/networks/ionity)

## Chargers near this site

- [Gretna Green, UK · Tesla](https://ampmap.co.uk/charger/tesla-gretna-green-supercharger-uk) - CCS 250 kW · A74M Junction 21/22 · From 61p/kWh
- [EH - Welcome Break Gretna Green · GRIDSERVE](https://ampmap.co.uk/charger/electric-highway-welcome-break-gretna-green-services-uk) - CCS 50 kW, CHAdeMO 50 kW · A74 M 21-22 · From 92p/kWh
- [Gretna Train Station, Glasgow Road, Gretna Green · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-gretna-train-station-glasgow-road-gretna-green-uk) - Type 2 7 kW · Gretna Train Station, Glasgow Road, Gretna Green
- [Garo Dual 7KW · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-garo-dual-7kw-2-uk) - Type 2 7 kW · Central Ave Car Park
- [Gretna, UK - Caledonia Park · Tesla](https://ampmap.co.uk/charger/tesla-gretna-uk-caledonia-park-uk) - CCS 250 kW · 59, Glasgow Road · From 50p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/ionity-gretna-green-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Ionity (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
