JB Motors · EV charging site
JB Motors
Garage, Malton, YO17 7BN
JB Motors is an EV charging site in Malton, North Yorkshire, run by JB Motors and open 24 hours a day. It has a single 7 kW Type 2 socket. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 18 charging sessions here over the last 30 days. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Water Lane Car Park (BP Pulse), 0.2 miles away.
Status
1 of 1 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- JB Motors
- Opening hours
- Open 24 hours
- Payment
- In the operator's appRFID card
- Charger ID
- DLA42189-2
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at JB Motors?
Up to 7 kW AC via Type 2.
How many charging sockets does JB Motors have?
1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.
Is JB Motors open 24/7?
Yes - JB Motors is open 24 hours a day, 7 days a week.
When is JB Motors busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 7 am. The live status on this page shows what is free before you set off.
How reliable is JB Motors?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 18 observed charging sessions.
Who operates JB Motors?
JB Motors is on the JB Motors network.
Where is the nearest charger with 50 kW or more to JB Motors?
Water Lane Car Park (BP Pulse) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at JB Motors?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at JB Motors?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at JB Motors?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Wentworth Street car park
- Water Lane Car Park
- Morrisons Malton
- Morrisons Malton
- Ryedale Council Offices
- Norton-on-Derwent SF Connect
- Cheapest nearby
- Water Lane Car Park · 89p per kWh · 50 kW · 0.2 mi
- Fastest nearby
- Norton-on-Derwent SF Connect · 150 kW · 0.5 mi