# JB Motors

Web page: https://ampmap.co.uk/charger/jb-motors-uk

JB Motors is an EV charging site in Malton, North Yorkshire, run by JB Motors and open 24 hours a day. It has a single 7 kW Type 2 socket. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 18 charging sessions here over the last 30 days.

## Status

1 of 1 open at 22 Nov 2026, 15:43 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Garage, YO17 7BN
- **Area:** Malton, North Yorkshire, United Kingdom
- **Coordinates (latitude, longitude):** 54.13731, -0.79836

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed | 1 free |

## Site information

- **Operator:** JB Motors
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at JB Motors?

Up to 7 kW AC via Type 2.

### How many charging sockets does JB Motors have?

1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.

### Is JB Motors open 24/7?

Yes - JB Motors is open 24 hours a day, 7 days a week.

### When is JB Motors busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 7 am. The live status on this page shows what is free before you set off.

### How reliable is JB Motors?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 18 observed charging sessions.

### Who operates JB Motors?

JB Motors is on the JB Motors network.

### How long does a Tesla Model Y Long Range take to charge at JB Motors?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at JB Motors?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at JB Motors?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Malton](https://ampmap.co.uk/chargers/united-kingdom/north-yorkshire/malton)

## Chargers near this site

- [Wentworth Street car park](https://ampmap.co.uk/charger/wentworth-street-car-park-uk) - Type 2 22 kW · 2 Wentworth St
- [Water Lane Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-water-lane-car-park-uk) - CCS / CHAdeMO / Type 2 50 kW · Water Lane Car Park, Railway Street · From 89p/kWh
- [Morrisons Malton · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-malton-uk) - CCS 50 kW, CHAdeMO 50 kW · Castlegate
- [Morrisons Malton · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-malton-2-uk) - Type 2 60 kW, CHAdeMO 50 kW · Castlegate
- [Ryedale Council Offices](https://ampmap.co.uk/charger/ryedale-council-offices-uk) - Type 2 22 kW
- [Norton-on-Derwent SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-norton-on-derwent-sf-connect-uk) - CCS 150 kW · Welham Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/jb-motors-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: JB Motors (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
