Jet Charge · EV charging site
Jet Refinery Filling Station
Eastfield Road, Grimsby, DN40 3DJ
Jet Refinery Filling Station is an EV charging site in Grimsby, North East Lincolnshire, run by Jet Charge. It has a single socket, with CCS at up to 150 kW. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is County Hotel (BP Pulse), 2.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Jet Charge
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 808 1964572
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Jet Refinery Filling Station (Jet Charge)?
Up to 150 kW DC via CCS, CHAdeMO.
How many charging sockets does Jet Refinery Filling Station (Jet Charge) have?
1 charging socket: 1 × 150 kW CCS, 1 × 100 kW CHAdeMO.
Who operates Jet Refinery Filling Station?
Jet Refinery Filling Station is on the Jet Charge network. For site issues, the operator lists +44 808 1964572.
Where is the nearest other charger with 50 kW or more to Jet Refinery Filling Station (Jet Charge)?
County Hotel (BP Pulse) is 2.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Jet Refinery Filling Station (Jet Charge)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Jet Refinery Filling Station (Jet Charge)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Jet Refinery Filling Station (Jet Charge)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 19 Saint Denys Close · 45p per kWh · 5 kW · 0.6 mi