Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Joju Ltd · EV charging site

21 Gains road

21 Gains road, Southsea, PO4 0PJ

21 Gains road is an EV charging site in Southsea, Portsmouth, run by Joju Ltd. It has a single 4 kW Type 2 socket. 39 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Portsmouth, The Pompey Centre (Source EV), 0.8 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 9 Feb 2023Last verified 9 Feb 2023

Connectors

Type 2 · 4 kW1 connector

Site information

Operator
Joju Ltd
Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 4 kW Type 2~13h 50m
Tesla Model 3 Rear-Wheel Drive 10–80% · 4 kW Type 2~9h 59m
Audi Q4 e-tron 50 10–80% · 4 kW Type 2~12h 46m
Hyundai IONIQ 5 10–80% · 4 kW Type 2~12h 42m
MG Motor MG4 Trophy 10–80% · 4 kW Type 2~10h 40m
Hyundai Kona Electric Long Range 10–80% · 4 kW Type 2~10h 9m
Nissan LEAF 10–80% · 4 kW Type 2~7h 0m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at 21 Gains road (Joju Ltd)?

Up to 4 kW AC via Type 2.

How many charging sockets does 21 Gains road (Joju Ltd) have?

1 charging socket: 1 × 4 kW Type 2.

Who operates 21 Gains road?

21 Gains road is on the Joju Ltd network.

Where is the nearest charger with 50 kW or more to 21 Gains road (Joju Ltd)?

Portsmouth, The Pompey Centre (Source EV) is 0.8 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at 21 Gains road (Joju Ltd)?

A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 21 Gains road (Joju Ltd)?

A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at 21 Gains road (Joju Ltd)?

A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 9 Feb 2023

Amp Map does not take payment. You pay the operator.