Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Joju Ltd · EV charging site

Egbert Road - Lighting Column 2

4-6 Egbert Road, Winchester, SO23 7ED

Egbert Road - Lighting Column 2 is an EV charging site in Winchester, Hampshire, run by Joju Ltd. It has a single 4 kW Type 2 socket. 41 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Winchester City Council : Coach Park Car Park (MER), 0.1 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 May 2023Last verified 4 May 2023

Connectors

Type 2 · 4 kW1 connector

Site information

Operator
Joju Ltd
Opening hours
Not published
Access
Public
Getting there
Street light between the houses number 4 and 6

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 4 kW Type 2~13h 50m
Tesla Model 3 Rear-Wheel Drive 10–80% · 4 kW Type 2~9h 59m
Audi Q4 e-tron 50 10–80% · 4 kW Type 2~12h 46m
Hyundai IONIQ 5 10–80% · 4 kW Type 2~12h 42m
MG Motor MG4 Trophy 10–80% · 4 kW Type 2~10h 40m
Hyundai Kona Electric Long Range 10–80% · 4 kW Type 2~10h 9m
Nissan LEAF 10–80% · 4 kW Type 2~7h 0m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Egbert Road - Lighting Column 2 (Joju Ltd)?

Up to 4 kW AC via Type 2.

How many charging sockets does Egbert Road - Lighting Column 2 (Joju Ltd) have?

1 charging socket: 1 × 4 kW Type 2.

Who operates Egbert Road - Lighting Column 2?

Egbert Road - Lighting Column 2 is on the Joju Ltd network.

Where is the nearest charger with 50 kW or more to Egbert Road - Lighting Column 2 (Joju Ltd)?

Winchester City Council : Coach Park Car Park (MER) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Egbert Road - Lighting Column 2 (Joju Ltd)?

A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Egbert Road - Lighting Column 2 (Joju Ltd)?

A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Egbert Road - Lighting Column 2 (Joju Ltd)?

A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 4 May 2023

Amp Map does not take payment. You pay the operator.