Joju Ltd · EV charging site
King Alfred Terrace - Lighting Column 2
7-8 King Alfred Terrace, Winchester, SO23 7DE
King Alfred Terrace - Lighting Column 2 is an EV charging site in Winchester, Hampshire, run by Joju Ltd. It has a single 4 kW Type 2 socket. 45 other charging sites are listed within a mile, and the nearest site with 50 kW or more is St Peter's Car Park (Be.EV), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Joju Ltd
- Opening hours
- Not published
- Access
- Public
- Getting there
- Street light between the houses number 7 and 8
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at King Alfred Terrace - Lighting Column 2 (Joju Ltd)?
Up to 4 kW AC via Type 2.
How many charging sockets does King Alfred Terrace - Lighting Column 2 (Joju Ltd) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates King Alfred Terrace - Lighting Column 2?
King Alfred Terrace - Lighting Column 2 is on the Joju Ltd network.
Where is the nearest charger with 50 kW or more to King Alfred Terrace - Lighting Column 2 (Joju Ltd)?
St Peter's Car Park (Be.EV) is 0.2 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at King Alfred Terrace - Lighting Column 2 (Joju Ltd)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at King Alfred Terrace - Lighting Column 2 (Joju Ltd)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at King Alfred Terrace - Lighting Column 2 (Joju Ltd)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.