Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Leigh Road Car Park

Leigh Road, Wimborne Minster, BH21 1AF

Leigh Road Car Park is an EV charging site in Wimborne Minster, Bournemouth, Christchurch and Poole Council, run by Be.EV and open 24 hours a day. Its 4 sockets reach up to 50 kW, with CCS at the top speed, and published prices run from £0.59 to £0.84 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 49% uptime and recorded 141 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Allenview West Car Park (Be.EV), 0.3 miles away.

Status

0 of 4 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 50 kW2 connectors · 84p per kWh1 in use1 out of service
KM0059-0199% reliabilityCharging
KM0059-0299% reliabilityOut of order
Type 2 · 22 kW2 connectors · 59p per kWhOut of service
AD00336-10% reliabilityOut of order
AD00336-20% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
AD00336-1

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW84p per kWh
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£46
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£34
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Leigh Road Car Park (Be.EV)?

The listed price is Type 2 £0.59/kWh · CCS £0.84/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Leigh Road Car Park (Be.EV)?

Up to 50 kW DC via Type 2, CCS.

How many charging sockets does Leigh Road Car Park (Be.EV) have?

4 charging sockets: 2 × 22 kW Type 2, 2 × 50 kW CCS. Live per-socket availability is shown on this page.

Is Leigh Road Car Park (Be.EV) open 24/7?

Yes - Leigh Road Car Park (Be.EV) is open 24 hours a day, 7 days a week.

When is Leigh Road Car Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 7 am. The live status on this page shows what is free before you set off.

How reliable is Leigh Road Car Park (Be.EV)?

Amp Map measured 49% uptime here from recorded live status over the last 30 days, across 141 observed charging sessions.

Who operates Leigh Road Car Park?

Leigh Road Car Park is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Leigh Road Car Park (Be.EV)?

Allenview West Car Park (Be.EV) is 0.3 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Leigh Road Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Leigh Road Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Leigh Road Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.