Joju Ltd · EV charging site
Market Street - Bollard Adjacent To Lighting Column 11
193-195 Market Street, Eastleigh, SO50 5PY
Market Street - Bollard Adjacent To Lighting Column 11 is an EV charging site in Eastleigh, Hampshire, run by Joju Ltd. It has a single 4 kW Type 2 socket. 33 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Romsey Road Car Park (Be.EV), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Joju Ltd
- Opening hours
- Not published
- Access
- Public
- Getting there
- Bollard between the houses number 193 and 195
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Market Street - Bollard Adjacent To Lighting Column 11 (Joju Ltd)?
Up to 4 kW AC via Type 2.
How many charging sockets does Market Street - Bollard Adjacent To Lighting Column 11 (Joju Ltd) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates Market Street - Bollard Adjacent To Lighting Column 11?
Market Street - Bollard Adjacent To Lighting Column 11 is on the Joju Ltd network.
Where is the nearest charger with 50 kW or more to Market Street - Bollard Adjacent To Lighting Column 11 (Joju Ltd)?
Romsey Road Car Park (Be.EV) is 0.4 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Market Street - Bollard Adjacent To Lighting Column 11 (Joju Ltd)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Market Street - Bollard Adjacent To Lighting Column 11 (Joju Ltd)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Market Street - Bollard Adjacent To Lighting Column 11 (Joju Ltd)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Hight Street - Bollard Adjacent To Lighting Column 23
- Market Street - Bollard Adjacent To Lighting Column 18
- Hight Street - Bollard Adjacent To Lighting Column 10
- Desborough Road - Bollard Adjacent To Lighting Column 17
- Desborough Road - Bollard Adjacent To Lighting Column 32
- Cranbury Road - Bollard Adjacent To Lighting Column 22