Joju Ltd · EV charging site
Park Avenue - Lighting Column 3
Park Avenue, Winchester, SO23 8DJ
Park Avenue - Lighting Column 3 is an EV charging site in Winchester, Hampshire, run by Joju Ltd. It has a single 4 kW Type 2 socket. 44 other charging sites are listed within a mile, and the nearest site with 50 kW or more is St Peter's Car Park (Be.EV), 140 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Joju Ltd
- Opening hours
- Not published
- Access
- Public
- Getting there
- Street light in front of Winchester Scool of Art South Building
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Park Avenue - Lighting Column 3 (Joju Ltd)?
Up to 4 kW AC via Type 2.
How many charging sockets does Park Avenue - Lighting Column 3 (Joju Ltd) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates Park Avenue - Lighting Column 3?
Park Avenue - Lighting Column 3 is on the Joju Ltd network.
Where is the nearest charger with 50 kW or more to Park Avenue - Lighting Column 3 (Joju Ltd)?
St Peter's Car Park (Be.EV) is 140 yards away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Park Avenue - Lighting Column 3 (Joju Ltd)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Park Avenue - Lighting Column 3 (Joju Ltd)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Park Avenue - Lighting Column 3 (Joju Ltd)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Park Avenue
- St Peter's Car Park
- WCC St Peters Car Park
- Durngate 2
- Middle Brook Street Car Park
- Hyde Abbey Road - Lighting Column 3
- Cheapest nearby
- St Peter's Car Park · 59p per kWh · 60 kW · 140 yd
- Fastest nearby
- St Peter's Car Park · 60 kW · 140 yd