Joju Ltd · EV charging site
Serpentine Lane & Serpentine Lane Disabled
Serpentine Lane, Poole, BH15 2BQ
Serpentine Lane & Serpentine Lane Disabled is an EV charging site in Poole, Bournemouth, Christchurch and Poole Council, run by Joju Ltd. Both of its sockets are 22 kW Type 2. 8 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Seldown Lane (Be.EV), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Joju Ltd
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Serpentine Lane & Serpentine Lane Disabled (Joju Ltd)?
Up to 22 kW AC via Type 2.
How many charging sockets does Serpentine Lane & Serpentine Lane Disabled (Joju Ltd) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Serpentine Lane & Serpentine Lane Disabled?
Serpentine Lane & Serpentine Lane Disabled is on the Joju Ltd network.
Where is the nearest charger with 50 kW or more to Serpentine Lane & Serpentine Lane Disabled (Joju Ltd)?
Seldown Lane (Be.EV) is 0.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Serpentine Lane & Serpentine Lane Disabled (Joju Ltd)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Serpentine Lane & Serpentine Lane Disabled (Joju Ltd)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Serpentine Lane & Serpentine Lane Disabled (Joju Ltd)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Serpentine Lane
- Seldown Lane
- Lagland Street Service Area
- Prosperous Street Car Park
- Swimming Pool Car Park
- Old Orchard
- Cheapest nearby
- Serpentine Lane · 59p per kWh · 22 kW · 120 yd
- Fastest nearby
- Seldown Lane · 75 kW · 0.2 mi