Joju Ltd · EV charging site
The Crescent - Bollard Adjacent To Lighting Column 4
40-42 The Crescent, Eastleigh, SO50 9BR
The Crescent - Bollard Adjacent To Lighting Column 4 is an EV charging site in Eastleigh, Hampshire, run by Joju Ltd. It has a single 4 kW Type 2 socket. 31 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Romsey Road Car Park (Be.EV), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Joju Ltd
- Opening hours
- Not published
- Access
- Public
- Getting there
- Bollard between the houses number 40 and 42
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at The Crescent - Bollard Adjacent To Lighting Column 4 (Joju Ltd)?
Up to 4 kW AC via Type 2.
How many charging sockets does The Crescent - Bollard Adjacent To Lighting Column 4 (Joju Ltd) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates The Crescent - Bollard Adjacent To Lighting Column 4?
The Crescent - Bollard Adjacent To Lighting Column 4 is on the Joju Ltd network.
Where is the nearest charger with 50 kW or more to The Crescent - Bollard Adjacent To Lighting Column 4 (Joju Ltd)?
Romsey Road Car Park (Be.EV) is 0.1 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Crescent - Bollard Adjacent To Lighting Column 4 (Joju Ltd)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Crescent - Bollard Adjacent To Lighting Column 4 (Joju Ltd)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Crescent - Bollard Adjacent To Lighting Column 4 (Joju Ltd)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- George Street - Bollard Adjacent To Lighting Column 6
- Newton Road - Bollard Adjacent To Lighting Column 6
- The Crescent - Bollard Adjacent To Lighting Column 9
- Romsey Road Car Park
- Archers Road - Lighting Column 10
- Archers Road - Bollard Adjacent To Lighting Column 4
- Cheapest nearby
- Romsey Road Car Park · 59p per kWh · 75 kW · 0.1 mi
- Fastest nearby
- Romsey Road Car Park · 75 kW · 0.1 mi