EV charging site
Kilchoan House Hotel
Kilchoan House Hotel, Isle Of Mull
Kilchoan House Hotel is an EV charging site in Isle Of Mull, Argyll and Bute. Both of its sockets are 22 kW Type 2, and charging is listed as free. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Kilchoan Ferry Terminal (Chargeplace Scotland), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free(from Open Charge Map, 20 Apr 2022)
- Phone (from Open Charge Map)
- 01972510200
- Getting there
- may need as ask in hotel to turn charger on
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Kilchoan House Hotel?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Kilchoan House Hotel?
Up to 22 kW AC via Type 2.
How many charging sockets does Kilchoan House Hotel have?
2 charging sockets: 2 × 22 kW Type 2.
Can anyone charge at Kilchoan House Hotel?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Kilchoan House Hotel?
Kilchoan Ferry Terminal (Chargeplace Scotland) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Kilchoan House Hotel?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kilchoan House Hotel?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Kilchoan House Hotel?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Kilchoan Ferry Terminal · 50 kW · 0.7 mi