Libraries NI · EV charging site
Libraries NI
Fivemiletown Library, 67 Main Street, BT75 0PG
Libraries NI is an EV charging site in Fivemiletown, Mid Ulster, run by Libraries NI and open 24 hours a day. Both of its sockets are 22 kW Type 2. Amp Map measured 100% uptime here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Old Mill Garage (Monta), 8.2 miles away.
Status
2 of 2 available
Checking status…
Connectors
Type 2 · 22 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Libraries NI
- Opening hours
- Open 24 hours
- Payment
- In the operator's appRFID card
- Charger ID
- DKK58636-1
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Libraries NI?
Up to 22 kW AC via Type 2.
How many charging sockets does Libraries NI have?
2 charging sockets: 2 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is Libraries NI open 24/7?
Yes - Libraries NI is open 24 hours a day, 7 days a week.
How reliable is Libraries NI?
Amp Map measured 100% uptime here from recorded live status over the last 30 days.
Who operates Libraries NI?
Libraries NI is on the Libraries NI network.
Where is the nearest charger with 50 kW or more to Libraries NI?
Old Mill Garage (Monta) is 8.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Libraries NI?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Libraries NI?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Libraries NI?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Valley Hotel · 24 kW · 110 yd