Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Lidl · EV charging site

Lidl

Lakeview Rd, Craigavon

Lidl is an EV charging site at Lakeview Rd in Craigavon, Armagh City Banbridge and Craigavon, run by Lidl. Both of its sockets are 50 kW CCS. Amp Map lists 1 other charge point named Lidl in Craigavon. 8 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is HRL Loughview (BP Pulse), 2.7 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 12 Aug 2026Last verified 12 Aug 2026

Connectors

CCS · 50 kW2 connectors

Site information

Operator
Lidl
Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)

Facilities

SupermarketLidl

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Lidl?

Up to 50 kW DC via CCS.

How many charging sockets does Lidl have?

2 charging sockets: 2 × 50 kW CCS.

Who operates Lidl?

Lidl is on the Lidl network.

Where is the nearest other charger with 50 kW or more to Lidl?

HRL Loughview (BP Pulse) is 2.7 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Lidl?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lidl?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Lidl?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 12 Aug 2026

Amp Map does not take payment. You pay the operator.