Lidl · EV charging site
Lidl-Ashton-Under-Lyne
Cavendish Street, Ashton-under-Lyne, OL6 7PF
Lidl-Ashton-Under-Lyne is an EV charging site in Ashton-under-Lyne, Borough of Tameside, run by Lidl. It has a single socket, with CCS and CHAdeMO at up to 50 kW. 12 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Ashton Pools (Be.EV), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Lidl
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.74/kWh; other tariffs available(from Open Charge Map, 21 Jan 2025)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lidl-Ashton-Under-Lyne?
The listed price is £0.74/kWh; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Lidl-Ashton-Under-Lyne?
Up to 50 kW DC via Type 2, CCS, CHAdeMO.
How many charging sockets does Lidl-Ashton-Under-Lyne have?
1 charging socket: 1 × 22 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO.
Who operates Lidl-Ashton-Under-Lyne?
Lidl-Ashton-Under-Lyne is on the Lidl network.
Where is the nearest other charger with 50 kW or more to Lidl-Ashton-Under-Lyne?
Ashton Pools (Be.EV) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lidl-Ashton-Under-Lyne?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lidl-Ashton-Under-Lyne?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lidl-Ashton-Under-Lyne?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Ashton Pool
- Ashton Pools
- Henrietta Street Car Park
- EH - IKEA Manchester
- Ashton Bus Station (tfgm Access Only)
- MFG BP Maynestone
- Cheapest nearby
- EH - IKEA Manchester · 59p per kWh · 50 kW · 0.4 mi
- Fastest nearby
- MFG BP Maynestone · 150 kW · 0.5 mi