Lidl · EV charging site
Lidl Barton-upon-Humber
Ferriby Road, Brough, DN18 5LQ
Lidl Barton-upon-Humber is an EV charging site in Brough, East Riding of Yorkshire, run by Lidl. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the price is listed as £0.65/kWh. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Wingfield Farm (Hessle) (evyve), 3.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Lidl
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.65/kWh(from Open Charge Map, 18 Feb 2025)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lidl Barton-upon-Humber?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Lidl Barton-upon-Humber?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Lidl Barton-upon-Humber have?
2 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Lidl Barton-upon-Humber?
Lidl Barton-upon-Humber is on the Lidl network.
Where is the nearest other charger with 50 kW or more to Lidl Barton-upon-Humber?
Wingfield Farm (Hessle) (evyve) is 3.1 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lidl Barton-upon-Humber?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lidl Barton-upon-Humber?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lidl Barton-upon-Humber?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cottage Lane Car Park
- Pod Point Tesco Superstore - Barton Upon Humber
- Wingfield Farm (Hessle)
- Pod Point Aldi - Hessle
- IONITY GmbH IONITY Hull VH
- Red Sails, Hull
- Cheapest nearby
- Pod Point Aldi - Hessle · 25.2p per kWh · 7 kW · 3.3 mi
- Fastest nearby
- IONITY GmbH IONITY Hull VH · 400 kW · 3.4 mi