# Lidl-Basingstoke Road

Web page: https://ampmap.co.uk/charger/lidl-basingstoke-road-uk

Lidl-Basingstoke Road is an EV charging site in Lower Earley, Wokingham, run by Lidl. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 577 Basingstoke Road, RG2 0SJ
- **Area:** Lower Earley, Wokingham, United Kingdom
- **Coordinates (latitude, longitude):** 51.42142, -0.96857

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |

- **Price:** £0.74/kWh; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Lidl
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Lidl-Basingstoke Road?

The listed price is £0.74/kWh; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Lidl-Basingstoke Road?

Up to 50 kW DC via CHAdeMO, Type 2, CCS.

### How many charging sockets does Lidl-Basingstoke Road have?

2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 50 kW CCS.

### Who operates Lidl-Basingstoke Road?

Lidl-Basingstoke Road is on the Lidl network.

### How long does a Tesla Model Y Long Range take to charge at Lidl-Basingstoke Road?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lidl-Basingstoke Road?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Lidl-Basingstoke Road?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Lower Earley](https://ampmap.co.uk/chargers/united-kingdom/wokingham/lower-earley)
- [Lidl chargers](https://ampmap.co.uk/networks/lidl)

## Chargers near this site

- [Motorline Nissan Reading · Nissan UK Dealer Network](https://ampmap.co.uk/charger/nissan-uk-dealer-network-motorline-nissan-reading-uk) - Type 2 7 kW · Imperial Way
- [Shell Recharge Shell Fairfield](https://ampmap.co.uk/charger/shell-recharge-shell-fairfield-uk) - CCS 300 kW, CHAdeMO 63 kW · 585 Basingstoke Rd · From 89p/kWh
- [Reading FC Stadium · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-reading-fc-stadium-uk) - CCS 160 kW, CHAdeMO 60 kW · Biscuit Way
- [VOCO Reading · Go Zero](https://ampmap.co.uk/charger/go-zero-voco-reading-uk) - Type 2 11 kW, Type 2 7 kW · Voco Reading Hotel
- [Ecotricity Green Park Business Park](https://ampmap.co.uk/charger/ecotricity-green-park-business-park-uk) - Type 2 22 kW · M4 Junction 11
- [Pod Point Crosfield School](https://ampmap.co.uk/charger/pod-point-crosfield-school-2-uk) - Type 2 7 kW · Shinfield Road · From 30p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/lidl-basingstoke-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 4 Sept 2024).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
