Lidl · EV charging site
Lidl Ferndown
Ringwood Road, Ferndown, BH22 9BB
Lidl Ferndown is an EV charging site in Ferndown, Dorset, run by Lidl. It has a single socket, with CCS at up to 60 kW. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Smart Charge, 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Lidl
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.74/kWh; other tariffs available(from Open Charge Map, 24 Sept 2024)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lidl Ferndown?
The listed price is £0.74/kWh; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Lidl Ferndown?
Up to 60 kW DC via Type 2, CCS.
How many charging sockets does Lidl Ferndown have?
1 charging socket: 1 × 22 kW Type 2, 1 × 60 kW CCS, 1 × 60 kW CCS.
Who operates Lidl Ferndown?
Lidl Ferndown is on the Lidl network.
Where is the nearest other charger with 50 kW or more to Lidl Ferndown?
Smart Charge is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lidl Ferndown?
A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lidl Ferndown?
A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lidl Ferndown?
A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Smart Charge
- Esso West Moors - Ferndown
- Pod Point Oakdene Forest Park
- Woodman, Ringwood
- Normandy Way
- Westover Kia
- Cheapest nearby
- Pod Point Oakdene Forest Park · 45.6p per kWh · 22 kW · 0.6 mi
- Fastest nearby
- Smart Charge · 150 kW · 0.2 mi