# Birkenhead North Railway Station · LiFe (Raw Charging)

Web page: https://ampmap.co.uk/charger/life-birkenhead-north-railway-station-uk

Birkenhead North Railway Station is an EV charging site in Wallasey, Metropolitan Borough of Wirral, run by LiFe (Raw Charging). All 4 of its sockets are 7 kW Type 2, and the price is listed as £0.30/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Station Road, CH41 7AZ
- **Area:** Wallasey, Metropolitan Borough of Wirral, United Kingdom
- **Coordinates (latitude, longitude):** 53.40560, -3.05695

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 4 | Not listed |

- **Price:** £0.30/kWh (from Open Charge Map)

## Site information

- **Operator:** LiFe (Raw Charging)
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Birkenhead North Railway Station (LiFe (Raw Charging))?

The listed price is £0.30/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Birkenhead North Railway Station (LiFe (Raw Charging))?

Up to 7 kW AC via Type 2.

### How many charging sockets does Birkenhead North Railway Station (LiFe (Raw Charging)) have?

4 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.

### Who operates Birkenhead North Railway Station?

Birkenhead North Railway Station is on the LiFe (Raw Charging) network.

### How long does a Tesla Model Y Long Range take to charge at Birkenhead North Railway Station (LiFe (Raw Charging))?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Birkenhead North Railway Station (LiFe (Raw Charging))?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Birkenhead North Railway Station (LiFe (Raw Charging))?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Wallasey](https://ampmap.co.uk/chargers/united-kingdom/metropolitan-borough-of-wirral/wallasey)
- [LiFe (Raw Charging) chargers](https://ampmap.co.uk/networks/life-raw-charging)

## Chargers near this site

- [Laird Street Service Station · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-laird-street-service-station-uk) - CCS 50 kW, CHAdeMO 50 kW · 269 Laird Street
- [Opp house 2 in Rostherne Avenue, Wallasey · City EV](https://ampmap.co.uk/charger/city-ev-opp-house-2-in-rostherne-avenue-wallasey-uk) - Type 2 7 kW · Opp house 2
- [o/s house 27 Rostherne Avenue, Wallasey · City EV](https://ampmap.co.uk/charger/city-ev-o-s-house-27-rostherne-avenue-wallasey-uk) - Type 2 7 kW · o/s house 27
- [o/s house 412 Park Road North, Birkenhead · City EV](https://ampmap.co.uk/charger/city-ev-o-s-house-412-park-road-north-birkenhead-uk) - Type 2 7 kW · o/s house 412 Park Road North,
- [Pod Point Tesco Extra - Birkenhead](https://ampmap.co.uk/charger/pod-point-tesco-extra-birkenhead-uk) - Type 2 7 kW · Bidston Village Road · From 44.4p/kWh
- [o/s house 5 Rostherne Avenue, Wallasey · City EV](https://ampmap.co.uk/charger/city-ev-o-s-house-5-rostherne-avenue-wallasey-uk) - Type 2 7 kW · o/s house 5

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/life-birkenhead-north-railway-station-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 Oct 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
