# Hooton Railway Station · LiFe (Raw Charging)

Web page: https://ampmap.co.uk/charger/life-hooton-railway-station-uk

Hooton Railway Station is an EV charging site in Neston, Cheshire West and Chester, run by LiFe (Raw Charging). Both of its sockets are 7 kW Type 2.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Hooton Road, CH66 7NL
- **Area:** Neston, Cheshire West and Chester, United Kingdom
- **Coordinates (latitude, longitude):** 53.29738, -2.97705

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** £0.30/kWh. Parking fees apply. (from Open Charge Map)

## Site information

- **Operator:** LiFe (Raw Charging)
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Hooton Railway Station (LiFe (Raw Charging))?

The listed price is £0.30/kWh. Parking fees apply.. Prices can change, so check the price at the charger before you start.

### How fast is charging at Hooton Railway Station (LiFe (Raw Charging))?

Up to 7 kW AC via Type 2.

### How many charging sockets does Hooton Railway Station (LiFe (Raw Charging)) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Hooton Railway Station?

Hooton Railway Station is on the LiFe (Raw Charging) network.

### How long does a Tesla Model Y Long Range take to charge at Hooton Railway Station (LiFe (Raw Charging))?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hooton Railway Station (LiFe (Raw Charging))?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Hooton Railway Station (LiFe (Raw Charging))?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Neston](https://ampmap.co.uk/chargers/united-kingdom/cheshire-west-and-chester/neston)
- [LiFe (Raw Charging) chargers](https://ampmap.co.uk/networks/life-raw-charging)

## Chargers near this site

- [BizSpace The Business Centre · Roam Charging](https://ampmap.co.uk/charger/roam-charging-bizspace-the-business-centre-uk) - Type 2 22 kW · Hooton Road
- [Thornton Garage · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-thornton-garage-uk) - CCS 50 kW, CHAdeMO 50 kW · Chester Road
- [EVC Inglewood Manor · Roam Charging](https://ampmap.co.uk/charger/roam-charging-evc-inglewood-manor-uk) - Type 2 22 kW · Badgers Rake Lane
- [Eastham Point, Birkenhead · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-eastham-point-birkenhead-uk) - CCS 300 kW · New Chester Road, Eastham · From 89p/kWh
- [o/s house 24 Palantine Road, Bromborough · City EV](https://ampmap.co.uk/charger/city-ev-o-s-house-24-palantine-road-bromborough-uk) - Type 2 7 kW · o/s house 24 Palantine Road,
- [o/s house 40 Palantine Road, Bromborough · City EV](https://ampmap.co.uk/charger/city-ev-o-s-house-40-palantine-road-bromborough-uk) - Type 2 7 kW · o/s house 40 Palantine Road,

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/life-hooton-railway-station-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 Oct 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
