# Mount Pleasant Car Park · LiFe (Raw Charging)

Web page: https://ampmap.co.uk/charger/life-mount-pleasant-car-park-uk

Mount Pleasant Car Park is an EV charging site in Liverpool, run by LiFe (Raw Charging). Its 4 sockets reach up to 7 kW, with Type 2 at the top speed, and the price is listed as £0.30/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Mount Pleasant Car Park, L3 5TB
- **Area:** Liverpool, United Kingdom
- **Coordinates (latitude, longitude):** 53.40462, -2.97555

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |
| Type 2 | 3 kW | 2 | Not listed |

- **Price:** £0.30/kWh (from Open Charge Map)

## Site information

- **Operator:** LiFe (Raw Charging)
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** Charge Points are located on the 2nd floor of Mount Pleasant Car Park. No eligibility restrictions. Maximum length of stay for electric vehicles is 4 x hours. No parking fees apply whilst charging.

## Common questions

### How much does it cost to charge at Mount Pleasant Car Park (LiFe (Raw Charging))?

The listed price is £0.30/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Mount Pleasant Car Park (LiFe (Raw Charging))?

Up to 7 kW AC via Type 2.

### How many charging sockets does Mount Pleasant Car Park (LiFe (Raw Charging)) have?

4 charging sockets: 2 × 7 kW Type 2, 2 × 3 kW Type 2.

### Who operates Mount Pleasant Car Park?

Mount Pleasant Car Park is on the LiFe (Raw Charging) network.

### How long does a Tesla Model Y Long Range take to charge at Mount Pleasant Car Park (LiFe (Raw Charging))?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mount Pleasant Car Park (LiFe (Raw Charging))?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Mount Pleasant Car Park (LiFe (Raw Charging))?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Liverpool](https://ampmap.co.uk/chargers/united-kingdom/liverpool/liverpool)
- [LiFe (Raw Charging) chargers](https://ampmap.co.uk/networks/life-raw-charging)

## Chargers near this site

- [Q-Park Hanover Street · LiFe (Raw Charging)](https://ampmap.co.uk/charger/life-q-park-hanover-street-uk) - Type 2 22 kW · 44 Hanover Street
- [ubitricity Distributed Energy Systems UK Ltd. 18 Falkner Street](https://ampmap.co.uk/charger/ubitricity-18-falkner-street-uk) - Ubitricity · Type 2 5 kW · 18 Falkner Street · From 45p/kWh
- [Q Park Liverpool John Lewis 4 · Blink Charging](https://ampmap.co.uk/charger/blink-charging-q-park-liverpool-john-lewis-4-uk) - Type 2 7 kW · Q Park Liverpool John Lewis 4
- [The Royal Liverpool Hospital · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-the-royal-liverpool-hospital-uk) - Type 2 7 kW · Prescot Street
- [ubitricity Distributed Energy Systems UK Ltd. 7 Bridgewater Street](https://ampmap.co.uk/charger/ubitricity-7-bridgewater-street-uk) - Ubitricity · Type 2 5 kW · 7 Bridgewater Street · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 10 - 14 Jamaica Street](https://ampmap.co.uk/charger/ubitricity-10-14-jamaica-street-uk) - Ubitricity · Type 2 5 kW · 10 - 14 Jamaica Street · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/life-mount-pleasant-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 Oct 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
