LiFe (Raw Charging) · EV charging site
Queen Street
Queen Street, Ashington, NE65 0DQ
Queen Street is an EV charging site in Ashington, Northumberland, run by LiFe (Raw Charging). Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons Amble (GeniePoint), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- LiFe (Raw Charging)
- Opening hours
- Not published
- Access
- Public
- Price
- £0.35/kW via LiFe App or Octopus Juice Card(from Open Charge Map, 10 Jun 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Queen Street (LiFe (Raw Charging))?
The listed price is £0.35/kW via LiFe App or Octopus Juice Card. Prices can change, so check the price at the charger before you start.
How fast is charging at Queen Street (LiFe (Raw Charging))?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Queen Street (LiFe (Raw Charging)) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Queen Street?
Queen Street is on the LiFe (Raw Charging) network.
Where is the nearest other charger with 50 kW or more to Queen Street (LiFe (Raw Charging))?
Morrisons Amble (GeniePoint) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Queen Street (LiFe (Raw Charging))?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Queen Street (LiFe (Raw Charging))?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Queen Street (LiFe (Raw Charging))?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.