# Seacombe Ferry Terminal · LiFe (Raw Charging)

Web page: https://ampmap.co.uk/charger/life-seacombe-ferry-terminal-uk

Seacombe Ferry Terminal is an EV charging site in Birkenhead, Metropolitan Borough of Wirral, run by LiFe (Raw Charging). All 4 of its sockets are 7 kW Type 2, and the price is listed as £0.30/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Victoria Place, CH44 6QY
- **Area:** Birkenhead, Metropolitan Borough of Wirral, United Kingdom
- **Coordinates (latitude, longitude):** 53.40932, -3.01663
- **Getting there:** Charge points are available to all members of the general public. There are no restrictions on length of stay & no parking fees apply.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 4 | Not listed |

- **Price:** £0.30/kWh (from Open Charge Map)

## Site information

- **Operator:** LiFe (Raw Charging)
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Seacombe Ferry Terminal (LiFe (Raw Charging))?

The listed price is £0.30/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Seacombe Ferry Terminal (LiFe (Raw Charging))?

Up to 7 kW AC via Type 2.

### How many charging sockets does Seacombe Ferry Terminal (LiFe (Raw Charging)) have?

4 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.

### Who operates Seacombe Ferry Terminal?

Seacombe Ferry Terminal is on the LiFe (Raw Charging) network.

### How long does a Tesla Model Y Long Range take to charge at Seacombe Ferry Terminal (LiFe (Raw Charging))?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Seacombe Ferry Terminal (LiFe (Raw Charging))?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Seacombe Ferry Terminal (LiFe (Raw Charging))?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Birkenhead](https://ampmap.co.uk/chargers/united-kingdom/metropolitan-borough-of-wirral/birkenhead)
- [LiFe (Raw Charging) chargers](https://ampmap.co.uk/networks/life-raw-charging)

## Chargers near this site

- [Princess Dock MSCP · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-princess-dock-mscp-uk) - Type 2 22 kW · William Jessop Way
- [Princes Dock (Liverpool) · evyve](https://ampmap.co.uk/charger/the-geniepoint-network-princes-dock-uk) - Type 2 22 kW · 4 William Jessop Way · From 65p/kWh
- [Elgin Way Car Park · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-elgin-way-car-park-uk) - Type 2 7 kW · 2A Argyle Street
- [Elgin Way · LiFe (Raw Charging)](https://ampmap.co.uk/charger/life-elgin-way-uk) - Type 2 7 kW · Elgin Way
- [o/s house 3 The Summit, Wallasey · City EV](https://ampmap.co.uk/charger/city-ev-o-s-house-3-the-summit-wallasey-uk) - Type 2 7 kW · o/s house 3
- [Titanic Hotel](https://ampmap.co.uk/charger/titanic-hotel-uk) - Type 2 22 kW · Regent Rd

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/life-seacombe-ferry-terminal-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 Oct 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
