EV charging site
May Garland Inn
Horam Road, Hailsham, TN21 0LJ
May Garland Inn is an EV charging site in Hailsham, East Sussex. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed, and the price is listed as £4 per hour. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Herstmonceux Surgery (Charge Your Car), 4.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £4 per hour(from Open Charge Map, 8 Aug 2021)
- Phone (from Open Charge Map)
- 01435812249
- Notes
- 22kw charger 11kw charger coming soon
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at May Garland Inn?
The listed price is £4 per hour. Prices can change, so check the price at the charger before you start.
How fast is charging at May Garland Inn?
Up to 22 kW AC via Type 2, NACS, Blue Commando (2P+E).
How many charging sockets does May Garland Inn have?
2 charging sockets: 1 × 22 kW Type 2, 2 × 2 kW Type 2, 1 × 7 kW NACS, 1 × 7 kW Blue Commando (2P+E).
Where is the nearest charger with 50 kW or more to May Garland Inn?
Herstmonceux Surgery (Charge Your Car) is 4.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at May Garland Inn?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at May Garland Inn?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at May Garland Inn?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point Farleys House and Gallery Ltd · 25.2p per kWh · 7 kW · 2.7 mi
- Fastest nearby
- Herstmonceux Surgery · 50 kW · 4.4 mi