Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

MER · EV charging site

Basepoint Business Centre

Chairborough Road, High Wycombe, HP12 3UL

Basepoint Business Centre is an EV charging site in High Wycombe, Buckinghamshire, run by MER. It has a single 60 kW CCS socket. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Basepoint High Wycombe (Be.EV), 0.2 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 6 Jan 2024Last verified 6 Jan 2024

Connectors

CCS · 60 kW2 connectors

Site information

Operator
MER
Opening hours
Not published
Access
Public

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 60 kW CCS~58 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 60 kW CCS~43 min
Audi Q4 e-tron 50 10–80% · 60 kW CCS~57 min
Hyundai IONIQ 5 10–80% · 60 kW CCS~53 min
MG Motor MG4 Trophy 10–80% · 60 kW CCS~47 min
Hyundai Kona Electric Long Range 10–80% · 60 kW CCS~49 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Basepoint Business Centre (MER)?

Up to 60 kW DC via CCS.

How many charging sockets does Basepoint Business Centre (MER) have?

1 charging socket: 2 × 60 kW CCS.

Who operates Basepoint Business Centre?

Basepoint Business Centre is on the MER network.

Where is the nearest other charger with 50 kW or more to Basepoint Business Centre (MER)?

Basepoint High Wycombe (Be.EV) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Basepoint Business Centre (MER)?

A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Basepoint Business Centre (MER)?

A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Basepoint Business Centre (MER)?

A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 6 Jan 2024

Amp Map does not take payment. You pay the operator.