MER · EV charging site
Beehive Park and Ride
The Portway, Salisbury, SP4 6BG
Beehive Park and Ride is an EV charging site in Salisbury, Wiltshire, run by MER. Both of its sockets are 7 kW Type 2, and the price is listed as £0.52/kWh. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Four Acres SF Connect (BP Pulse), 1.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MER
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.52/kWh(from Open Charge Map, 13 Jul 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Beehive Park and Ride (MER)?
The listed price is £0.52/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Beehive Park and Ride (MER)?
Up to 7 kW AC via Type 2.
How many charging sockets does Beehive Park and Ride (MER) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Beehive Park and Ride?
Beehive Park and Ride is on the MER network.
Where is the nearest charger with 50 kW or more to Beehive Park and Ride (MER)?
Four Acres SF Connect (BP Pulse) is 1.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Beehive Park and Ride (MER)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Beehive Park and Ride (MER)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Beehive Park and Ride (MER)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Bradbury House 1
- Urban Energy
- Four Acres SF Connect
- London Road Car Park
- Five Rivers Leisure Centre
- Five Rivers (Campus)
- Fastest nearby
- Four Acres SF Connect · 150 kW · 1.3 mi